Skip to content
Buy Access Panels

Delivery to Ohio

Access panels in Ohio

BuyAccessPanels.com ships access panels and access doors across Ohio, including Columbus, Cleveland and Cincinnati, in US dollars with duties prepaid. Orders leave Vaughan, Ontario, Canada within 1–2 business days and usually arrive 3–7 business days after shipping. Shipping is $9.99, free from $99; panels start at $5.49 USD.

Updated

How much is shipping to Ohio, and is there duty to pay?

Shipping, duties, delivery, tax and returns for orders to Ohio
PricesIn US dollars (USD).
Shipping cost9.99 USD on orders under 99 USD; free from 99 USD. Alaska and Hawaii: by shipping quote at checkout.
Duties and customsUS orders ship with duties and customs fees prepaid, so there is nothing to pay on delivery.
When it shipsOrders ship within 1–2 business days, Monday to Friday excluding holidays; orders placed after 12 pm Eastern ship from the next business day. Tracking is emailed when the order ships.
Delivery to OhioUsually 3–7 business days after shipping, from Vaughan, Ontario, Canada, by a tracked courier. Estimates, not guarantees.
Sales taxNo US sales tax is charged on online orders at present; checkout shows any tax before you pay.
ReturnsWithin 30 days of delivery, unused and in the original packaging, with no restocking fee; returns go to Vaughan, Ontario.

Which building code applies to access panels in Ohio?

Code editions in force in Ohio
State code2024 Ohio Building Code (based on 2021 IBC)
Building code (commercial)IBC 2021
Residential code (houses)Check with your local building department
Plumbing code2024 Ohio Plumbing Code (based on IPC 2021)
Current edition in force sinceMarch 1, 2024
Sourcewww.richlandcountyoh.gov

The 2024 Ohio Building Code, based on the 2021 IBC, took effect on March 1, 2024, alongside the 2024 Ohio Plumbing Code, based on the 2021 IPC.

What size access opening does the code ask for in Ohio?

Ohio's plumbing code is based on the International Plumbing Code (IPC). For its access-opening rules, check with your local building department.

Which access panels ship to Ohio?

Opening and USD price for each product
ProductOpening it fitsPrice (USD)
6x6 in Plastic Drywall Access Panel with Hinged DoorMaximum service opening 4.35 × 4.35 in$8.49 USD
8x8 in Plastic Drywall Access Panel with Hinged DoorMaximum service opening 6.35 × 6.35 in$9.49 USD
12x12 in Plastic Drywall Access Panel with Hinged DoorMaximum service opening 10.35 × 10.35 in (estimated)$13.99 USD
12x16 in Plastic Drywall Access Panel with Hinged DoorMaximum service opening 10.35 × 14.35 in (estimated)$16.49 USD
Access Panel Round 5.5 in Click-Fit (Outside Dimension 6.5 in) Plastic WhiteFits 5.25–5.5 in round openings (smallest estimated)$6.49 USD
8x8 in Spring-Loaded Plastic Drywall Access PanelFits 6 × 6 to 8 × 8 in openings$9.49 USD
10 in Round Spring-Loaded Access Panel for 6–9 in OpeningsFits 6–9 in round openings$10.99 USD
14x14 in Spring-Loaded Plastic Drywall Access PanelFits 10 × 10 to 14 × 14 in openings$18.49 USD
Access Panel Round 4 in Click-Fit (Outside Dimension 5 in) Plastic WhiteFits 3.75–4 in round openings (smallest estimated)$5.49 USD

We deliver to Columbus, Cleveland, Cincinnati, Toledo, Akron, Dayton and every other address in Ohio. There is no store or warehouse in the state: every order ships from Vaughan, Ontario, to your door.

Questions about ordering in Ohio

How long does delivery to Ohio take?

Orders ship from Vaughan, Ontario, Canada within 1–2 business days and usually arrive 3–7 business days after shipping. Tracking is emailed when your order ships. These are estimates, not guarantees.

Do I pay duty or customs on delivery in Ohio?

No. US orders ship with duties and customs fees prepaid, so there is nothing to pay on delivery.

Which building code applies in Ohio?

2024 Ohio Building Code (based on 2021 IBC). Buildings other than houses follow a building code based on the 2021 International Building Code; the current edition has been in force since March 1, 2024. For houses, check with your local building department. Cities can amend it, so your permit office has the final word.