Skip to content
Buy Access Panels

United States by state

Access panels shipped to all 50 states

BuyAccessPanels.com ships access panels and access doors to all 50 states and Washington, DC, in US dollars with duties prepaid. Orders leave Vaughan, Ontario, Canada within 1–2 business days and usually arrive 3–7 business days after shipping. Shipping is 9.99, free from 99; Alaska and Hawaii by shipping quote; panels start at $5.49 USD.

Updated

What does shipping to the US cost, and is there duty to pay?

These terms are the same in every state and DC.

Shipping, duties, delivery, tax and returns for US orders
PricesIn US dollars (USD).
Shipping cost9.99 USD on orders under 99 USD; free from 99 USD. Alaska and Hawaii: by shipping quote at checkout.
Duties and customsUS orders ship with duties and customs fees prepaid, so there is nothing to pay on delivery.
When it shipsOrders ship within 1–2 business days, Monday to Friday excluding holidays; orders placed after 12 pm Eastern ship from the next business day. Tracking is emailed when the order ships.
Delivery to any stateUsually 3–7 business days after shipping, from Vaughan, Ontario, Canada, by a tracked courier. Estimates, not guarantees.
Sales taxNo US sales tax is charged on online orders at present; checkout shows any tax before you pay.
ReturnsWithin 30 days of delivery, unused and in the original packaging, with no restocking fee; returns go to Vaughan, Ontario.

Which building code does each state use?

The International Building Code (IBC) covers commercial buildings, the International Residential Code (IRC) covers houses, and the plumbing code sets the access rules for fixtures. “Adopted locally” means the state leaves the choice to cities and counties, so ask your local building department. Each row with code editions links to its source.

Building, residential and plumbing code editions and delivery estimate for each state and DC
StateBuilding codeResidential codePlumbing codeDelivery after shipping
AlabamaIBC 2021Check with your local building departmentIPC 20213–7 business days
AlaskaIBC 2021Check with your local building departmentCheck with your local building department3–7 business days
Arizonaadopted locallyadopted locallyadopted locally3–7 business days
ArkansasCheck with your local building department3–7 business days
CaliforniaCheck with your local building department3–7 business days
ColoradoCheck with your local building department3–7 business days
ConnecticutIBC 2021IRC 2021IPC 20213–7 business days
Delawareadopted locallyadopted locallyIPC 20213–7 business days
District of ColumbiaIBC 2015IRC 2015IPC 20153–7 business days
FloridaCheck with your local building department3–7 business days
GeorgiaIBC 2024IRC 2024IPC 20243–7 business days
HawaiiIBC 2018IRC 2018UPC 20183–7 business days
IdahoIBC 2018IRC 2018UPC 20153–7 business days
Illinoisadopted locallyadopted locallyState code3–7 business days
IndianaIBC 2012IRC 2018IPC 20063–7 business days
IowaIBC 2024IRC 2024Check with your local building department3–7 business days
KansasCheck with your local building department3–7 business days
KentuckyIBC 2015IRC 2015State code3–7 business days
LouisianaIBC 2021IRC 2021IPC 20213–7 business days
MaineCheck with your local building department3–7 business days
MarylandIBC 2021IRC 2021Check with your local building department3–7 business days
MassachusettsCheck with your local building department3–7 business days
MichiganCheck with your local building department3–7 business days
MinnesotaCheck with your local building departmentIRC 2018UPC 20183–7 business days
MississippiCheck with your local building department3–7 business days
Missouriadopted locallyadopted locallyCheck with your local building department3–7 business days
MontanaIBC 2024IRC 2024UPC 20243–7 business days
NebraskaIBC 2018IRC 2018UPC 20183–7 business days
NevadaCheck with your local building department3–7 business days
New HampshireIBC 2024IRC 2024IPC 20243–7 business days
New JerseyIBC 2024IRC 2024NSPC 20243–7 business days
New MexicoCheck with your local building department3–7 business days
New YorkCheck with your local building department3–7 business days
North CarolinaIBC 2015IRC 2015IPC 20153–7 business days
North DakotaIBC 2024IRC 2024UPC3–7 business days
OhioIBC 2021Check with your local building departmentIPC 20213–7 business days
OklahomaIBC 2024IRC 2024IPC 20243–7 business days
OregonIBC 2024Check with your local building departmentUPC 20243–7 business days
PennsylvaniaIBC 2021IRC 2021IPC 20213–7 business days
Rhode IslandCheck with your local building departmentIRC 2021Check with your local building department3–7 business days
South CarolinaIBC 2021IRC 2021IPC 20213–7 business days
South DakotaIBC 2024Check with your local building departmentCheck with your local building department3–7 business days
TennesseeCheck with your local building department3–7 business days
TexasIBC 2012IRC 2012Check with your local building department3–7 business days
UtahIBC 2024IRC 2021IPC 20243–7 business days
VermontIBC 2021Check with your local building departmentIPC 20243–7 business days
VirginiaIBC 2021IRC 2021IPC 20213–7 business days
WashingtonIBC 2021IRC 2021UPC 20213–7 business days
West VirginiaIBC 2018IRC 2018IPC 20183–7 business days
WisconsinIBC 2021state code, not the IRCState code3–7 business days
WyomingIBC 2024Check with your local building departmentCheck with your local building department3–7 business days

Code editions checked on 2026-11-16 against the International Code Council's adoption data and state sources, and each state source re-read on 2026-11-18. Where the source did not confirm an edition, the table says to check with your local building department. Cities can amend a state code; your permit office has the final word.

What size access opening do the model codes ask for?

For plumbing, access panel code requirements come from the plumbing code. The Uniform Plumbing Code (UPC) sets rules for two jobs: concealed slip joints need an access panel or utility space at least 12 in in its least dimension (402.10), and a whirlpool tub's opening must let the pump be taken out and replaced (409.6). The International Residential Code (IRC) has a similar slip-joint rule for houses.

  • UPC 2021 and 2024, 402.10: a fixture with concealed slip joints needs an unobstructed access panel or utility space at least 12 in in its least dimension.
  • UPC 2021 and 2024, 409.6: a whirlpool tub is installed to its maker's instructions, so follow them for pump access; the access opening has no fixed size, but must be big enough to take out and replace the circulation pump.
  • IRC 2021, P2704.1: in houses, a concealed slip-joint connection needs an access opening at least 12 in in its smallest dimension.

For a plumbing code based on the International Plumbing Code (IPC), check with your local building department for its access-opening rules.

For an opening of at least 12 × 12 in, the 14x14 in Spring-Loaded Plastic Drywall Access Panel (fits 10 × 10 to 14 × 14 in openings) works. The largest opening any panel here works with is 14 × 14 in; none of our sizes covers a larger one.

Where does the plumbing code require cleanouts, and do they have to stay reachable?

In states on the Uniform Plumbing Code, section 707 sets where cleanouts go and how much room they need. The 2021 and 2024 editions say the same; states adopt different editions and amend them, so check your state's version:

  • UPC 2021 and 2024, 707.4: a cleanout at the upper end of every horizontal drainage pipe; on a run longer than 100 ft, one for each 100 ft or part of it; another for each total horizontal change of direction over 135°; and one above the fixture connection fitting of each urinal. Cleanouts may be left out on horizontal lines under 5 ft that don't serve sinks or urinals, and on pipe sloped 72° or less from vertical. Above the lowest floor, only the building drain, its horizontal branches, kitchen sinks and urinals still need them, and a two-way cleanout near where the building drain meets the sewer may replace the upper-end one.
  • UPC 2021 and 2024, 707.8: every cleanout must be above grade, readily accessible and placed where it serves its purpose, unless it sits under an approved cover plate that still gives the clearances the section asks for.
  • UPC 2021 and 2024, 707.9: clear space in front of the cleanout of at least 18 × 18 in on pipe 2 in or smaller, and 24 × 24 in on larger pipe. That is room to work, not an access-panel size.

In states on the International Plumbing Code (IPC), or on a state or local code, check with your local building department for the cleanout rules.

If a cleanout ends up behind a finished wall, these guides show how to keep it reachable: what a sewer cleanout is and how to find yours, where a kitchen sink cleanout is and where a plumbing stack's cleanout is. No fire rating is claimed for our panels, so for a cleanout in a fire-rated wall or ceiling, ask your building department what the opening needs.

State guides