Skip to content
Buy Access Panels

Canada by province

Access panels shipped across Canada

BuyAccessPanels.com ships access panels and access doors to every province and territory, with prices in Canadian dollars. Orders leave Vaughan, Ontario within 1–2 business days and usually arrive 2–7 business days after dispatch, longer to remote areas. Shipping is 14.99 CAD, free from 99 CAD before tax; Yukon, the Northwest Territories and Nunavut by shipping quote; panels start at $5.99 CAD.

Updated

How long does delivery take, and which code applies, in each province?

Delivery estimate and building code for each province we cover in detail
ProvinceDelivery after shippingBuilding code in forceMain cities
British Columbia5–7 business daysBC Building Code 2024Vancouver, Surrey, Victoria
Quebec2–7 business days; longer to remote areasQuebec Construction Code, Chapter I – Building, and National Building Code of Canada 2020 (amended)Montreal, Quebec City, Laval
Alberta2–7 business days; longer to remote areasNational Building Code – 2023 Alberta EditionCalgary, Edmonton, Red Deer
Nova Scotia2–7 business days; longer to remote areasNova Scotia Building Code RegulationsHalifax, Dartmouth, Sydney
New Brunswick2–7 business days; longer to remote areasNew Brunswick Building Code Administration Act, General Regulation 2021-2Moncton, Saint John, Fredericton
Prince Edward Island2–7 business days; longer to remote areasPrince Edward Island Building Codes RegulationsCharlottetown, Summerside, Stratford
Newfoundland and Labrador5–7 business daysCheck with your local building departmentSt. John's, Mount Pearl, Corner Brook

Every other province gets the same prices, shipping rule and returns. Shipping is 14.99 CAD under 99 CAD and free from 99 CAD before tax. Yukon, the Northwest Territories and Nunavut get the same prices and returns, with shipping by quote: checkout asks for a shipping quote there. Delivery times are estimates, not guarantees.

What do the building codes say about access openings?

Every target province's code except Newfoundland and Labrador's is based on the 2020 National Building Code and National Plumbing Code (for Newfoundland and Labrador, check with your local building department). They ask for access to whatever needs servicing, rather than for a particular panel (texts read on November 19, 2026, from the official copy in the NRC Publications Archive):

For a 300 × 300 mm (11.8 in) inspection opening, the 14x14 in Spring-Loaded Plastic Drywall Access Panel works (fits 10 × 10 to 14 × 14 in openings). The largest opening any panel here works with is 14 × 14 in. Check the size your inspector or the equipment maker asks for, then pick a panel that covers it.

The panels and doors sold online are not fire-rated, so they are not for openings in a required fire separation, such as a wall or ceiling between suites.

Where does the plumbing code require cleanouts, and do they have to stay reachable?

The National Plumbing Code of Canada 2020 sets where cleanouts go. British Columbia, Alberta, Quebec, Nova Scotia, New Brunswick and Prince Edward Island base their plumbing codes on it, each with its own amendments, so check your province's version:

  • National Plumbing Code 2020, 2025 printing, 2.4.7.1: a drainage system needs cleanouts that let all of it be cleaned, including one on the upstream side of, and directly over, each running trap; one at the bottom of an internal leader or within 3 m upstream of it; one of NPS 4 or larger on the building drain, as close as practical to where it leaves the building; one on each stack, at its bottom, within 3 m upstream of it or on the Y fitting joining the drain or branch; one for the piping downstream of an interceptor; and one more on a building drain for each total horizontal change of direction over 135°. A fixture outlet pipe or a trap with a removable trap dip can serve as a fixture drain's cleanout.
  • National Plumbing Code 2020, 2025 printing, 2.4.7.4: cleanouts and access covers must be placed so their openings are readily accessible for drain cleaning; a cleanout may not sit in a floor where it could be a hazard, or be used as a floor drain.
  • National Plumbing Code 2020, 2025 printing, 2.1.3.2: every fixture, cleanout, valve and piece of plumbing equipment must be readily accessible for use, cleaning and maintenance.

None of these articles sets an access-panel size for a cleanout. Article texts read on November 19, 2026, from the official copy in the NRC Publications Archive.

If a cleanout ends up behind a finished wall, these guides show how to keep it reachable: what a sewer cleanout is and how to find yours, where a kitchen sink cleanout is and where a plumbing stack's cleanout is. No fire rating is claimed for our panels, so for a cleanout in a fire-rated wall or ceiling, ask your building department what the opening needs.